Multi-Family Heat Pump & Water Heater Conversion in Berkeley, CA
    InstallationsHeat PumpsMini SplitsWater Heaters

    Multi-Family Heat Pump & Water Heater Conversion in Berkeley, CA

    Berkeley

    Project Overview

    Air Care Heating & Cooling completed a multi-family electrification project in Berkeley, California, replacing existing gas-fired heating and water heating equipment with high-efficiency electric heat pump systems.

    Air Care provides ductless mini-split installation in Berkeley, CA and throughout the Bay Area.

    Project Details

    Location

    Commercial · Berkeley, CA 94703

    Project Type

    Multi-Family HVAC Installation, Ductless Heat Pumps & Heat Pump Water Heaters

    Equipment

    Ductless Mini-Split Heat Pumps & Heat Pump Water Heaters

    Manufacturer

    Not specified

    Installation Team

    Mark & Juan

    Customer Challenge

    The property previously relied on individual gas wall furnaces for heating each apartment, and six gas-fired water heaters served the building. The wall furnaces provided heating only, with no cooling for residents, and all of the equipment kept the property dependent on natural gas.

    Our Recommendation

    We recommended a full electrification approach: removing the wall furnaces and installing a dedicated ductless mini-split heat pump system for each apartment, and replacing all six gas water heaters with new heat pump water heaters.

    Our Solution

    Our installation team, Mark and Juan, removed five wall furnaces and installed a dedicated ductless mini-split heat pump system for each apartment, providing residents with efficient heating and cooling from a single system. The project also included removing six existing gas water heaters and replacing them with new heat pump water heaters, further reducing the property’s reliance on natural gas.

    Outcome

    This Berkeley multi-family property received a major electrification upgrade with five new ductless heat pump systems and six new heat pump water heaters. Each apartment now has its own ductless system providing both heating and air conditioning, replacing the previous wall furnaces that provided heating only. The new heat pump water heaters also replaced the property’s gas-fired water heating equipment, creating a more comprehensive transition from gas to electric heat pump technology.

    The six heat pump water heaters installed on this project are part of our heat pump water heater installation services.

    What this electrification project changed

    The previous wall furnaces provided heating only. Replacing them with a dedicated ductless mini-split heat pump system for each apartment gives every resident both heating and cooling with individual control. Replacing the six gas water heaters with heat pump water heaters further reduced the property’s reliance on natural gas across both space heating and water heating.

    Before & After

    Multi-Family Heat Pump & Water Heater Conversion in Berkeley, CA — afterMulti-Family Heat Pump & Water Heater Conversion in Berkeley, CA — beforeBeforeAfter

    Drag the handle to compare

    Installation Process

    1. 1Removed five existing gas wall furnaces
    2. 2Installed five ductless mini-split heat pump systems
    3. 3Provided dedicated heating and cooling for each apartment
    4. 4Removed six existing gas water heaters
    5. 5Installed six new heat pump water heaters
    6. 6Converted space heating and water heating from gas-fired equipment to heat pump technology
    7. 7Tested the new HVAC and water heating equipment for proper operation

    Equipment Installed

    • Five ductless mini-split heat pump systems
    • Six new heat pump water heaters
    • Dedicated heating and cooling for each apartment

    Project Highlights

    • Five ductless mini-split heat pump systems installed
    • Six heat pump water heaters replacing gas units
    • Full gas-to-electric conversion for heating and hot water
    • Multi-family property in Berkeley, CA

    Customer Benefits

    • Heating and cooling in every apartment from one system
    • High-efficiency electric heat pump technology
    • Six new heat pump water heaters replacing gas units
    • Reduced reliance on natural gas across the property
    • Individual comfort control for each resident

    Energy & Efficiency Notes

    Five gas wall furnaces and six gas water heaters were replaced with electric heat pump equipment. Energy savings were not quantified for this project.

    Actual energy use depends on the equipment, installation, ductwork, usage, and utility rates. We review expected performance for your specific system rather than quoting a fixed savings number.

    Photo Gallery

    Click any photo to enlarge and zoom.

    Related Projects

    New ADU HVAC & Ventilation Installation in San Jose, CA in San JoseInstallations

    New ADU HVAC & Ventilation Installation in San Jose, CA

    San JoseDuctless Mini-Split Heat Pump & ERV

    Air Care Heating & Cooling completed the HVAC and ventilation installation for a newly constructed ADU in San Jose, CA 95125, including a 1-to-1 ductless mini-split heat pump system, an Energy Recovery Ventilator, and all required mechanical exhaust venting.

    View Project
    High-Efficiency Heat Pump & Mini-Split Installation in Palo Alto, CA in Palo AltoInstallations

    High-Efficiency Heat Pump & Mini-Split Installation in Palo Alto, CA

    Palo AltoMulti-Zone Heat Pump System

    Air Care Heating & Cooling completed a high-efficiency heat pump installation in Palo Alto, CA 94301 as part of a townhome remodel. The homeowner was referred to Air Care by a neighbor and wanted to replace the home’s older, outdated gas furnace with a modern heating and cooling solution.

    View Project

    Planning a Commercial HVAC Project?

    Tell us about the building and the equipment involved and we’ll review the project and next steps.